Back to all cases

Fengcheng Power Plant

๐Ÿ‡จ๐Ÿ‡ณ Chinaยท2021
Collected
DBREnergy

Case Summary

The accident was caused by risk factors with complex interactions at the management level. An energy constraint failure occurred when the transfer of dangerous energy transpired at the physical entity level, inducing the event.

Quantified Results

metric: null

Source

Title
Generation expansion planning using game theory approach to reduce carbon emission: A case study of Iran
Type
academic paper
Year
2021
Confidence Score
80%
View original source