Back to all cases
Veritas
๐ณ๐ด Norwayยท2015
Validated
DBREnergy
Case Summary
The study covered fracture, fatigue, stress analyses, NDE-evaluation of fabrication defects, the reliability of applied NDE method and an overall fracture and reliability analysis.
Source
- Title
- The use of the critical path and critical chain methods in the South African construction industry
- Type
- academic paper
- Year
- 2015
- Confidence Score
- 80%