Back to all cases
PT. X
🇮🇩 Indonesia·2024
Validated
DBRTextile
Case Summary
Applying Drum Buffer Rope (DBR) method reduced makespan by 1,119.46 hours and total production delay from 249.5 units to 116 units.
Quantified Results
metric: 1
Source
- Title
- Usulan Penjadwalan Flow Shop Dengan Metode Drum Buffer Rope dan Campbell, Dudek, Smith (CDS) Untuk Mengurangi Keterlambatan di Perusahaan Tekstile (Studi Kasus PT. X)
- Type
- academic paper
- Year
- 2024
- Confidence Score
- 80%