Back to all cases
Kongsberg Gruppen
π³π΄ NorwayΒ·2025
Validated
DBREnergy
Case Summary
The study developed a method to calculate the flange thrust load and the barrel external pressure for winches using large diameter wire ropes.
Source
- Title
- A Simulated Manufacturing Study on Rope Size and Number of Splits on the Productivity While Applying the Simplified Drum-Buffer-Rope Methodology
- Type
- academic paper
- Year
- 2025
- Confidence Score
- 80%