Case Summary
ence in Maison des Mines (Paris) in november 2013 : TAT was reduced by 15% The immobilization delay passed from 150 to less than 100 d. the queue line droped from 6 à 3 aircrafts waiting The OTD increased to 87% More than 1000 hours of additionnal flight per year (and so
Quantified Results
metric_1: 15% · metric_2: 87%