Back to all cases
Fengcheng Power Plant
🇨🇳 China·2021
Collected
DBREnergy
Case Summary
The accident was caused by risk factors with complex interactions at the management level. An energy constraint failure occurred when the transfer of dangerous energy transpired at the physical entity level, inducing the event.
Quantified Results
metric: null
Source
- Title
- Generation expansion planning using game theory approach to reduce carbon emission: A case study of Iran
- Type
- academic paper
- Year
- 2021
- Confidence Score
- 80%