Back to all cases
Acer
π TaiwanΒ·2004
Validated
DBRTechnology
Case Summary
Acer implemented the Drum-Buffer-Rope (DBR) system to optimize production processes.
Quantified Results
metric: 15
Source
- Title
- Multi-Project Scheduling and Control: A Process-Based Comparative Study of the Critical Chain Methodology and Some Alternatives
- Type
- academic paper
- Year
- 2004
- Confidence Score
- 80%