Back to all cases
Manufacturing industry
π UnknownΒ·2015
Collected
Thinking ProcessesManufacturing
Case Summary
The paper proposes to design a scheduling heuristic model to allocate tasks to the operators to get the least amount of operator idle time and reduce changeover downtime costs.
Source
- Title
- The use of the critical path and critical chain methods in the South African construction industry
- Type
- academic paper
- Year
- 2015
- Confidence Score
- 50%